Mass Timber Design Assist

Early-Stage Design Assist for Mass Timber Projects

Design assist is a collaborative approach where the mass timber supplier joins the project team early to support structural optimization, constructability, and cost control. We work alongside architects, structural engineers, and contractors during design development to align mass timber systems with fabrication, schedule, and performance requirements.

Improving Cost, Constructability, and Project Outcomes

This approach improves mass timber construction outcomes through early budgeting, system optimization, and fabrication-informed design. By addressing connection strategies, sequencing, and coordination upfront, design assist reduces project risk, improves cost certainty, and supports efficient installation and predictable project delivery.

Mass Timber design assist services

Our glulam products have been used in a wide range of mass timber projects, as demonstrated in the following examples, which highlight structural performance, long spans, and efficient installation in modern timber construction.

Mass Timber Design Assist for Predictable Outcomes

Early design assist aligns timber systems with cost, fabrication, and schedule, improving predictability and reducing risk across mass timber construction projects.

Let’s Get Started

Reach out using the form below and one of our mass timber product specialists will be in touch asap.

This field is for validation purposes and should be left unchanged.
Name(Required)
Consent(Required)

100%

The forests under our care are 100% certified to internationally recognized standards.

3350+

We create meaningful career opportunities in the areas where we operate, with over 3350 direct employee and contractor jobs supported.

3:1

Western plants more than three trees for every tree harvested, supporting forest renewal and contributing to climate solutions.